Product Requirements Document (PRD)

Project: [PROJECT NAME]
Client: [CLIENT NAME]
Version: [VERSION]
Date: [YYYY-MM-DD]
Author: [AUTHOR]
Status: Draft | In Review | Approved | Building


TL;DR

[3 sentences maximum. What are we building, why, and what is the expected outcome?]


1. Summary

Provide a clear, simple explanation of what this PRD is about and why it exists.

Example: “This PRD defines the requirements for an AI-powered workflow that supports [client goal], based on recent discovery sessions and provided materials.”


2. Background and Context

Summarize the context that led to this project:

  • What problem is the client facing?
  • What workflows or tasks are currently manual or inefficient?
  • What did we learn from transcripts, meetings, or SME discussions?

Keep this factual and concise.


3. Problem and Value

The Problem

[What pain exists today? Be specific with time, money, and effort costs.]

Cost of Inaction

[What happens if we do not solve this? Why now?]

Value Delivered

StakeholderValue
[Role 1][Specific benefit]
[Role 2][Specific benefit]

4. Goals and Non-Goals

4.1 Goals

List what the solution should accomplish.

Examples:

  • Automate extraction of key data fields
  • Improve internal review accuracy
  • Reduce processing time
  • Provide a demo or workflow to illustrate value

4.2 Non-Goals

List what the solution will not address.

Examples:

  • Full production deployment
  • Complex custom integrations
  • Long-term maintenance
  • UI/UX beyond simple interactions

5. Staged Milestones

POC (Proof of Concept)

Goal: Validate core technical assumption before investing in full build.

Scope:

  • [Minimal deliverable 1]
  • [Minimal deliverable 2]

Success Criteria: [What must be true to proceed?]

Timeline: [TBD, needs technical review]


MVP (Minimum Viable Product)

Goal: Deliver end-to-end functionality for limited scope (e.g., 1-3 pilot users or brands).

Scope:

  • [Feature 1]
  • [Feature 2]
  • [Feature 3]

Not in MVP:

  • [Deferred item 1]
  • [Deferred item 2]

Success Criteria: [Measurable outcomes]

Timeline: [TBD, needs technical review]


V1 (Production Release)

Goal: Scale to full production use across all users or brands.

Scope (additions to MVP):

  • [Enhancement 1]
  • [Enhancement 2]
  • [Enhancement 3]

Success Criteria: [Production-grade metrics]

Timeline: [TBD, needs technical review]


6. Users and Use Cases

6.1 Primary Users

List who will use or interact with the system:

  • [User type 1]
  • [User type 2]
  • [User type 3]

6.2 User Flow

Primary User: [Who is the main user?]

Journey:

  1. [Step 1: User action]
  2. [Step 2: System response]
  3. [Step 3: User action]
  4. [Continue as needed]

6.3 Key Use Cases

Describe the main tasks users want to perform:

  • [Use case 1]
  • [Use case 2]
  • [Use case 3]

7. Functional Requirements

Describe what the system must be able to do. Keep each requirement clear and testable.

7.1 Inputs

  • [Input requirement 1]
  • [Input requirement 2]

7.2 Processing

  • [Processing requirement 1]
  • [Processing requirement 2]

7.3 Outputs

  • [Output requirement 1]
  • [Output requirement 2]

7.4 Workflow or Interaction Logic

  • [Workflow requirement 1]
  • [Workflow requirement 2]

8. Technical Approach

Architecture Overview

[Simple diagram or description of components]

Key Components

ComponentTechnologyNotes
[Frontend][React/Angular/etc.][Key considerations]
[Backend][Node/Python/etc.][Key considerations]
[Database][Postgres/Mongo/etc.][Key considerations]
[Integrations][APIs][Key considerations]

Data Model

-- Key tables or collections (simplified)
[Schema or description]

API Endpoints

MethodEndpointPurpose
GET/api/…[Description]
POST/api/…[Description]

9. Assumptions

Things we are betting on being true. If any are wrong, scope or timeline changes.

#AssumptionRisk if Wrong
1[Assumption][Impact]
2[Assumption][Impact]
3[Assumption][Impact]

10. Open Questions

Blockers or decisions needing input before or during build.

#QuestionOwnerNeeded ByStatus
1[Question][Person][Date or Phase]Open
2[Question][Person][Date or Phase]Open

11. Tradeoffs

Key decisions with alternatives considered.

[Decision 1 Name]

OptionProsConsEffort
Option A (chosen)[Pros][Cons][Low/Med/High]
Option B[Pros][Cons][Low/Med/High]

Decision: [Which option and why]


12. Success Metrics

MetricTargetHow Measured
[Metric 1][Target value][Measurement method]
[Metric 2][Target value][Measurement method]

13. Dependencies

Technical

  • [Dependency 1: what is needed, who provides it]

External

  • [API access, credentials, third-party services]

Team

  • [Who needs to be involved, availability constraints]

14. Risks and Mitigations

RiskLikelihoodImpactMitigation
[Risk 1]High/Med/LowHigh/Med/Low[Mitigation strategy]
[Risk 2]High/Med/LowHigh/Med/Low[Mitigation strategy]

15. Timeline Summary

PhaseScopeDurationStatus
POC[Brief scope][TBD]Not Started
MVP[Brief scope][TBD]Not Started
V1[Brief scope][TBD]Not Started

Notes: Timeline estimates require technical review.


16. References

  • [Link to SOW, prototypes, related docs]
  • [Link to customer examples or inspiration]
  • [Link to relevant meeting notes]

Changelog

DateAuthorChange
[YYYY-MM-DD][Author]Initial draft