Operating.app Changes Executed - March 25, 2026
Executed by: Cursor Agent
Date: 2026-03-25
PR: #529
Summary
All CSO/SL assignments and EP role conversions have been completed in Operating.app as of March 25, 2026.
Changes Made
1. CSO Assignments Updated
| Client | Previous CSO | New CSO | Position ID | Notes |
|---|---|---|---|---|
| Eden DE | Zoran Selinger | Robert Tseng | 171355 | Consolidated under Robert |
| ABC | Uttam Kumaran | Pranav Narahari | 868649 | Updated to Pranav |
| LMNT Analytics | Robert Tseng | Uttam Kumaran | 1381394 | Consolidated under Uttam |
2. Combined CSO/SL Positions Confirmed
| Client | Person | CSO Position | SL Position | Status |
|---|---|---|---|---|
| Magic Spoon | Demilade Agboola | 1381392 (updated) | 1453994 (created) | ✓ Combined role confirmed |
| GlobalVetLink | Zoran Selinger | 1270790 | N/A | ✓ Already combined |
3. EP Role Conversions (Engagement Planner → IC)
| Person | Project | Old Role | New Role | Position ID | Notes |
|---|---|---|---|---|---|
| Amber Siru Lin | Eden Strategy | Engagement Planner | Data Analyst | 1221374 | Converted to IC |
| Amber Siru Lin | ABC | Engagement Planner | AI Engineer | 495333 | Converted to IC |
| Brylle Sean Girang | CTA | Engagement Planner | AI Engineer | 1150374 | Converted to IC |
| Mustafa Raja | Default Product Analytics | Engagement Planner | AI Engineer | 1179360 | Converted to IC |
4. Robert’s Position Corrected
| Position | Person | Action | Notes |
|---|---|---|---|
| 868650 | Robert Tseng | Restored to CSO | Accidentally changed to AI Engineer, corrected back to CSO |
Current Client-to-CSO/SL Mapping (Post-Changes)
| Client | CSO | SL | Combined? | Notes |
|---|---|---|---|---|
| Eden | Robert | TBD | No | Multiple projects need manual consolidation in Operating |
| CTA | Uttam | TBD | No | Needs SL assignment |
| GlobalVetLink | Zoran | Zoran | Yes | ✓ Combined role active |
| Magic Spoon | Demilade | Demilade | Yes | ✓ Combined role active |
| Amble | Zoran | TBD | No | Needs SL |
| ABC | Pranav | Samuel | No | ✓ CSO confirmed |
| LMNT | Uttam | TBD | No | Consolidate Analytics + Data Platform projects |
Remaining Manual Steps
The following require manual intervention in Operating.app (cannot be done via API):
- Consolidate Eden projects — Merge “Eden DE”, “Eden Strategy”, “Eden Martech”, “Eden Deal #4” into single “Eden” client entry
- Consolidate LMNT projects — Merge “LMNT Analytics” and “LMNT Data Platform” into single “LMNT” client entry
- Assign SLs — Eden, CTA, Amble, LMNT still need SL assignments
- Update project metadata — Review and clean up project statuses (e.g., “Tentative” vs “Confirmed”)
Roles After Changes
CSO Assignments (Confirmed)
- Eden: Robert Tseng
- CTA: Uttam Kumaran
- GlobalVetLink: Zoran Selinger
- Magic Spoon: Demilade Agboola
- Amble: Zoran Selinger
- ABC: Pranav Narahari
- LMNT: Uttam Kumaran
Combined CSO/SL Clients (Risk Pattern)
- GlobalVetLink — Zoran (needs escalation path documented)
- Magic Spoon — Demilade (needs escalation path documented)
EP Roles Converted
✓ All Engagement Planner positions have been converted to IC roles (Data Analyst or AI Engineer)
Audit Trail
All changes were made via the Operating MCP with timestamp notes indicating “March 2026 restructure” for traceability.
Next Review: Weekly leadership sync should verify these allocations match reality.