Internal (CSO notes)
Sources used
- Linear: Team GlobalVetLink (GLO).
list_issues(50, by updatedAt),list_projectswith milestones (no projects returned). - Transcripts (last 7 days, 2026-03-23–2026-03-30): None under
knowledge/clients/globalvetlink/transcripts/; none inknowledge/clients/unassigned/transcripts/naming GlobalVetLink. Supplementary (outside window):knowledge/clients/globalvetlink/transcripts/2026-03-21_globalvetlink_figjam_workflow_working_session.md; prior client-facing draftknowledge/clients/globalvetlink/meeting-notes/2026-03-23_weekly-kick-off-update.md. - Slack: Slack MCP
slack_search_public_and_private, queryin:client-globalvetlink after:2026-03-23. Supabase MCP: not configured in this environment. - Key links (from prior draft / context): FigJam / Figma project, GDrive folder, Data Platform Documentation sheet.
Recommendations
- Client block: Do not paste internal Slack re renewal bonus, Eden deck, or “pitch without sales.” Keep the update to delivery: tracking plan, Pendo alignment, funnel view, and scheduling review with Kat.
- Tool recommendation: Greg’s Slack noted a recommendation toward Amplitude; keep client wording at “tool recommendation one-pager” until the review call unless you want to preview the direction in email.
- Contract / scope: Internal thread said the modeled workflow may meet delivery without extra instrumentation; if you say that to the client, use their words (certificate creation + properties for type) and confirm with legal/commercial before sending.
Gaps
- Linear issue states are stale (last updates mostly mid-March); board does not reflect the latest Slack status (PM answers, near-final tracking plan).
- No transcript capture for the PM milestone confirmation meeting Greg mentioned in Slack.
- Pendo access and demo role status unknown from this pull; carry forward if still open.
Date: 2026-03-30
To: Kat Gillis and GlobalVetLink stakeholders (cc as you prefer)
From: Gregory Stoutenburg, Brainforge
Subject: GlobalVetLink — Weekly kick-off update (product analytics design sprint)
Summary
We closed the loop with your PM on the remaining milestone questions, finished a first-pass event tracking plan aligned to the FigJam model (certificate creation as one workflow with certificate type carried in properties), and built a primary-workflow funnel view in Pendo so you can see the shape of activation reporting before we finalize the written spec and tool recommendation. This week we want to schedule a review with you early in the week, incorporate any last tweaks, and hand over the Workstream 1 package for sign-off.
Timeline / Milestones
- Design sprint (Workstream 1): Draft tracking plan + violation/trim view + tool recommendation + strategy summary per SOW; client sign-off gating optional Workstream 2. (No dated milestones returned from Linear projects API.)
Last week’s achievements
Event data design & strategy
- PM sync: Confirmed open items on customer milestones so the tracking plan matches how you actually ship value (not generic checkout assumptions).
- Event tracking plan (draft): Turned the FigJam agreement into a concrete plan: shared steps across certificate flows, metadata for certificate type, and room for Smart Engine measurement notes where Pendo allows.
- Pendo: Added a funnel chart for the primary workflow so stakeholders can preview reporting before implementation decisions.
Program
- Kept shared artifacts in the usual places (GDrive folder, Data Platform Documentation sheet).
This week’s focus
Event data design & strategy
- Review session with you (Kat): Walk through the draft tracking plan, Pendo mapping / trim list, and funnel logic; lock any final product nuances.
- Deliverables package: Finalize master tracking plan, tool recommendation one-pager, and data strategy deck / discovery summary for Workstream 1 sign-off path.
- Light HubSpot framing: Keep instrumentation notes aligned with your automation roadmap without expanding implementation scope in this sprint.
Blockers
Access (if still unresolved)
- Pendo: Stable access for the shared analytics identity so audit and charts stay accurate.
- Demo / roles: If the full payment or signing path still cannot be exercised under the current demo role, we may need a short paired session or a permission tweak to ground-truth licensure and billing edges.
Action items
| Owner | Action | Due |
|---|---|---|
| Brainforge | Send meeting invite for Kat review (tracking plan + recommendations); finalize Workstream 1 written deliverables after feedback | This week |
| GlobalVetLink (Kat) | Review draft package; confirm Pendo access for globalvetLink@brainforge.ai if not already done | This week |
| GlobalVetLink (Kat) | If needed: demo role adjustment or 30 min working session for payment/signing validation | As needed |
Questions or discussion topics
- After you see the funnel and event list, do you want activation story to lead with time-to-first-signed-cert, license validated, or first billing-related activity (knowing segments differ)?
- For Smart Engine, should reporting prioritize compliance risk (submissions without checks), UX friction (why people turn it off), or both in one view?
Next sync
Proposed: Review call with Kat early this week (times to follow in thread or invite).
Channel: Shared Slack or email; we monitor globalvetLink@brainforge.ai.