ABC — Operating.app allocations remediation
Last updated: 2026-04-16
Parent audit: Operating allocation — current state (2026)
Repo skills: sl-allocation-updater · operating-api-setup
Signed agreements (Google Drive — source of truth)
Agreements library: Client agreements (root) → Executed Client Agreements → Active Clients → Default (Operating client ABC / Default Metrics). For ABC Home and Commercial Services, see the sibling ABC Home folder. gws: sl-allocation-updater § Evidence gate.
| Artifact | Link |
|---|---|
| Default / ABC metrics client folder | Drive folder |
| Consulting Agreement — BrainForgeAI LLC (signed PDF) | |
| Renewal — Consulting Agreement (signed PDF) |
Operating IDs
| Field | Value |
|---|---|
| Client | 39967 — ABC |
| Project | 146949 — ABC Deal 3 - Andi — clientId 39967, billingType fixed-price. |
Snapshot before remediation (2026-04-16)
| Topic | Finding |
|---|---|
| Project end date | through was null (open-ended) while many allocation rows used explicit end dates (including March / April 2026 sprint blocks). |
Applied via REST API (2026-04-16)
Project 146949
PATCH /v1/projects/146949
through→2026-09-30(planning horizon for Deal #3 — confirm vs SOW)
projectOwnerId remains 37936 (Uttam Kumaran) — unchanged.
Allocations
No bulk PATCH in this pass — April 2026 already had sprint-style rows (2862000, 2862002, 2862004, 2862006, 2862009, etc.). Reconcile % and through dates with HoD if the Sep 2026 project end implies longer IC blocks.
Positions (snapshot)
Includes Pranav (868649 CSO, 51085), Samuel SL (495336), IC rows on 495333–495335, 868633, etc. — see GET /v1/positions?projectId=146949.
Checklist
- Project —
throughset to2026-09-30(2026-04-16). - HoD / SL — align allocation end dates and % with Andi / Deal #3 scope through Q3 2026.
- Finance — confirm fixed-price and dates vs contract.
Last verified (REST API): 2026-04-16 — GET /v1/projects/146949.