ABC Andi — AI project plan (consolidated)

Last updated: 2026-04-16
Owner (SL): Uttam Kumaran
CSO (per plan export): Pranav (confirm surname / roster if needed.)
Purpose: Single place for scope, M1–M10, KPI framing, execution notes, and LOE / demo checkpoints merged from Notion April and May Roadmap for Andi. Notion ABC Andi hub stays for embedded DBs + quick links; ABC Andi April + May Project Plan stays for sign-offs (§7). See PR #854.


Canonical copy (this file)

LocationURL / path
Vault (this doc)knowledge/clients/abchomeandcommercial/resources/andi-ai-project-plan.md
PR tracking merge + Notion cleanupbrainforge-platform#854
Notion (index + sign-offs)ABC Andi April + May Project Plan
Notion (client hub)ABC Andi — hub — Client Health DB + quick links
Long-form export (vault)knowledge/clients/abchomeandcommercial/plans/ABC Andi April + May Project Plan.md
LinearABC / Migration — confirm current view name in Linear UI
Transcripts / discoveryknowledge/clients/abchomeandcommercial/transcripts/
OperatingProject 146949ABC Deal 3 - Andi (see knowledge/clients/default/resources/operating-allocations-remediation.md)

Engagement window: Dec 1 2025 → May 31 2026.

Draft planning visibility also lived in PR #564; execution truth is this file + Linear + Notion sign-offs.


Initiatives and projects

InitiativeTargetService line
Manual reduction of central-doc updatesApr 17AI
Transcript analysis (department insights, Andi Q&A loop)May 22AI
ProjectUnder initiativeStart → target
Central Doc CopilotManual reduction…Mar 30 → Apr 17
Department Based InsightsTranscript analysisMar 30 → May 22

Milestones (client deliverables)

#MilestoneProjectTargetDeliverable (summary)
M1Data foundationDept insightsApr 3Readout: transcript locations, keys, retention, PII; proof of one week pilot
M2TRIAGE workflow liveCentral Doc CopilotApr 3SOP + training; first live batch end-to-end
M3Placement automationCentral Doc CopilotApr 10Recommended insertion path / subheading; preview in Linear
M4Duplicate / conflict engineCentral Doc CopilotApr 10Production automation; results in Linear
M5End-of-day memo show-and-tellCentral Doc CopilotApr 17Full loop demo: trigger → memo → distribution
M6Weekly ingest liveDept insightsApr 24Table / screenshot: transcript counts by week & department
M7Questions + Andi E2E sliceDept insightsMay 1Questions → Andi answer → match past approved Q&A
M8Trainer loop + quality signalDept insightsMay 8Trainer review outcomes; % correct/incorrect
M9“Easy wins” by dept/topicDept insightsMay 15Ranked themes where trainer labels align with Andi
M10Weekly rhythm + RillDept insightsMay 22Live Rill walkthrough; top areas per department

Roadmap checkpoints + LOE (from Notion April and May Roadmap for Andi)

Parallel central doc copilot and transcript analysis streams; week numbers are target delivery windows for demos / client checkpoints.

CheckpointWeek
Data foundation (spike closed)1
TRIAGE workflow operationalized1
Weekly ingest live2
Placement automation live3
Questions + Andi answers (first E2E slice)3
Trainer loop + early quality signal4
Duplicate/conflict engine live5
“Easy wins” by department and topic5
End-of-week memo show-and-tell (final process)6
Weekly operating rhythm + Rill dashboard7

Central doc copilot — internal LOE (hours)

MilestoneEst. hours
Workflow + Linear design5
Trigger + integration8
Central doc access + indexing12–16
Duplicate detection10
Conflict detection (advisory)10
Placement + heading logic10
Preview generation3
Weekly batch + memo4
Pilot: first ticket set12
Total74–78

Demo checkpoints (cumulative hours): TRIAGE live ~15h → placement ~30h → duplicate/conflict in prod ~60h → end-of-week memo loop ~74–78h.

Transcript analysis — internal LOE (hours)

MilestoneEst. hours
Spike: transcript storage + access6–8
Weekly ingest pipeline15
Question extraction + Andi evaluation24–36
Categorization + “easy win” views12–16
Weekly automation + Rill20–24
Total77–99

Demo checkpoints (cumulative hours): data foundation ~10h → weekly ingest ~25h → Q + Andi E2E ~35h → trainer loop signal ~45h → easy wins ~60h → Rill rhythm ~77–99h.


Central Doc Copilot — execution notes (SL)

  • M2 depends on a real workflow decision: structured Linear input vs Google Doc comments/suggestions vs hybrid — drives automation triggers, placement (M3), preview (M4), and lock behavior. Do not parallelize automation build until CDC-1 class decisions are recorded and approved by CSO.
  • Change management: trainers must adopt the chosen input pattern or automation will misfire.
  • Tech surface: plan text references gws / Docs API for Doc-native flows; validate against whatever is implemented in the delivery repo and adjust tickets accordingly.

Department insights — execution notes (SL)

  • Treat M7 as first true Andi product slice: question extraction → model answer → alignment with approved Q&A.
  • M8–M10 are quality and operating cadence; reserve analyst / trainer time explicitly in Operating or sprint plans.

Risks (from context)

  • Architecture drift: text-to-SQL / doc automation approaches must stay tied to agreed workflow (avoid side-spikes that bypass triage).
  • Migration timeline slip: central doc + transcript pipelines are coupled to trainer capacity and ABC approval gates — escalate early if M2/M3 dates move.
  • Measurement: define “defects” or quality metrics for Andi answers before M8 so week-over-week improvement is provable.

Changelog

  • 2026-04-16: Consolidated from draft PR #564 (abc-andi-april-may-linear-tickets.md) for SL visibility; full CDC ticket write-ups remain in Notion export / that branch for paste-into-Linear workflows.
  • 2026-04-16: Merged Notion April and May Roadmap for Andi (checkpoint grid + LOE tables + hour-mark demos) into this file; aligned Notion ABC Andi April + May Project Plan (index), ABC Andi hub, archived duplicate plan + roadmap page + Client Health stub per PR #854. Re-link the hub’s “Client Health” property to a fresh Client Health row when you resume delivery tracking (the prior row page is archived).